NEWS

THU THIEM ZEIT RIVER PROJECT – PHASE 2: CONSTRUCTION PROGRESS AND THE SALES OPENING EVENT

29 Aug 2023

Thu Thiem Zeit River apartment project has a prime location in Thu Thiem new urban area and high-class internal facilities. The project is attracting the attention of potential customers who want to own a luxury apartment in Ho Chi Minh City. The following article will update detailed information on the progress of Thu Thiem Zeit River project – phase 2.

Information about Thu Thiem Zeit River project

Thu Thiem Zeit River project is invested in and developed by Vietnamese GS Enterprise (VGSE), which is known as a member of the Korean GS E&C Group. The project area is about 9,126m2 with two blocks: block T1 has 25 floors and block T2 has 32 floors. Aside from that, Block T2 is planned as the tallest tower in the functional area No.3 of Thu Thiem new urban area, next to Subdivision 1 – the financial subdivision. With this project, VGSE investor wants to make a sophisticated, comfortable and trendy living space for customers.

Dự án căn hộ Thu Thiem Zeit River
Thu Thiem Zeit River project is invested in and developed by the investor – VGSE

Reasons for buying Thu Thiem Zeit River apartment

Thu Thiem Zeit River apartment project is located at the intersection between two expensive roads, Tran Bach Dang Street (Crescent Boulevard) and Nguyen Co Thach Street. With a radius of less than 2km, when living in the project, future residents can access all the key destinations of Thu Thiem new urban area.

Luxury apartments of Thu Thiem Zeit River are meticulously designed with luxurious standard furniture to give modern living space for future owners. The landscape area of this project is planned and designed by the Land Sculptor Studio company. This company is known as a famous and experienced unit in landscape architecture planning.

Căn hộ Thu Thiem Zeit River
Thu Thiem Zeit River’s apartments are meticulously designed with luxurious interiors

In addition, the apartments are designed in a modern style with a delicate layout in harmony with nature. Specifically, Thu Thiem Zeit River apartments have outstanding facilities that integrate smart home technology of Thu Thiem Zeit River based on international standards:

  • The CCTV (Closed Circuit Television) system is equipped in public areas, corridors and basements to monitor safety and ensure security.
  • The location sensor technology can verify number plates, automatically open doors and check the number of available parking lots in each basement area.
  • The smart-elevator system: Zeit Elevator integrates loT technology and the smart-pass application that allows users to call the elevator without a card.
  • The sensor motion system is set up in the living room area to help detect motion and send notifications/images via SMS or application when the homeowner is not home.
  • The lighting control system is equipped for the entire apartment areas. It allows users to adjust on/off through the application without moving.
  • The power charging stations are equipped in basements B1 & B2: Fast charge in 1 hour 20 minutes (80% capacity), and Standard charge in 10 hours (80% capacity).
  • The swimming pool system uses salt electrolysis technology, which helps to disinfect and deodorize the water source. This system creates the purity of the water and does not cause dry skin irritation like in other chlorine-water pools.
Dự án Thu Thiem Zeit River giai đoạn 2
Smart parking basement of Thu Thiem Zeit River project 

Along with internal facilities, future residents of Thu Thiem Zeit River also inherit a modern system of external facilities, such as:

  • Thu Thiem central square, Nguyen Hue pedestrian street, Thu Thiem pedestrian bridge, Bach Dang statue,
  • International School of Ho Chi Minh City, British International School, ACG International School, Australian International School, Wellspring Bilingual School, etc.
  • Thu Thiem City Police of Thu Duc (District 2), City People’s Committee of Thu Duc (District 2), Thao Dien International Hospital, Vinmec Hospital, Hoan My International Clinic,
  • Mega Market An Phu, Emart Thu Thiem, Vincom, Big C, etc.
  • Sala City of Dai Quang Minh investor, Thu Thiem Lakeview of CII investor, The River Thu Thiem Refico and CII investors, Eco Smart City Thu Thiem of Lotte Group, etc.

Construction progress of Thu Thiem Zeit River project – Phase 2

Thu Thiem Zeit River project has the attention of potential customers because of its legal status and construction quality. The construction completed progress of Thu Thiem Zeit River project – phase 2:

  • Block T1: At present, the raw construction is to the 21st floor, which includes exterior painting to the 17th floor, internal painting to the 18th floor, 3 outer layers and primer to the 13th floor, and 3 inter layers to the 14th floor. Besides that, the technical team is also constructing the MEP system, including the lighting system on the 11th floor, the cable system for equipment inside and outside for the 13th-floor apartments and the drainage system on the 18th floor.
  • Block T2: The raw construction is to the 24th floor, which includes internal painting to the 18th floor, exterior painting to the 19th floor, 3 inter layers to the 9th floor, and 3 outer layers to the 19th floor. Meanwhile, the technical team is also constructing the MEP system, including the air conditioning system on the 9th floor and the ventilation and heat recovery system on the 12th floor.
  • Low-rise podium: Under construction on the 4th floor (inside and outside the building).
Dự án Thủ Thiêm Zeit River giai đoạn 2
Completion of Thu Thiem Zeit River project – Phase 2 

The sales opening event of Thu Thiem Zeit River Project – Phase 2

Thu Thiem Zeit River project has completed the sale-opening event of phase 1 with an inventory of 100 units. On the morning of 23rd July 2023, the sales-opening event of Block T2 Thu Thiem Zeit River attracted a large number of customers. In the inventory of Thu Thiem Zeit River project phase 2, there includes 1-bedroom, 2-bedroom, 3-bedroom, 4-bedroom, and duplex units. After a few hours of the event, 90% of Block T2’s inventory had found an owner. It has proven the attractiveness of the project in the challenging market conditions.

Thu Thiem Zeit River not only meets the needs for luxurious, classy and comfortable living space but also creates investment opportunities in the centre of Ho Chi Minh City. Above is information about Thu Thiem Zeit River project phase 2. If you are looking for a luxury apartment that can satisfy all the criteria for an ideal living place, Thu Thiem Zeit River apartments are a worthy choice.

Please contact VGSE and visit the homepage of Thu Thiem Zeit for more information:

  • Website: https://thuthiemzeit.com/river
  • Email: cskh@gsenc.com
  • Hotline: 0909 692 296
  • Project address: Nguyen Co Thach St., Thu Thiem Ward, Thu Duc City, Ho Chi Minh City
  • Sales office address: No.88, B2 St., An Loi Dong Ward, Thu Duc City, Ho Chi Minh City
LATEST NEWS